Section 90GA: Special procedure for certain traffic calming works in London.

Highways Act 1980 · 1980 c. 66View on legislation.gov.uk

Part V: Improvement of Highways

Traffic calming works fall within this section if—

the works are constructed by a local highway authority in Greater London, and
the requirements of subsections (2), (3) and (4) below have been complied with.

The requirement of this subsection is that before starting to construct the works the authority concerned gives the Secretary of State notice stating—

the nature, dimensions and location of the proposed works,
the type and description of signs which are proposed to be located in the highway in connection with the proposed hump, and
the period (of not less than one month) within which, and the address to which, the Secretary of State may send any comments on the proposal to the authority.

The requirement of this subsection is that in deciding—

whether to proceed with the construction of the works, and
what the nature, dimensions and location of the works as constructed are to be,

the authority concerned has regard to any comments made by the Secretary of State within the period stated in the notice.

The requirement of this subsection is that the authority concerned complies with such requirements as to consultation and publicity as may be prescribed by regulations made by the Secretary of State.

About this text

This legislation text comes from legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. These source and reuse terms cover the legislation text, not Remedy's commentary.

Reuse reviewed 21 August 2026 under Open Government Licence v3.0.